|
| | | | |
9LA1110-8AE10-4BA0Цена на сайте указана розничная в ЕВРО без учета НДС. Для уточнения цены и размера предоставляемой скидки - звоните или присылайте заявки | Заказной номер | Вес | PG | Описание продукта | Цена |
п»їHigh plant availability with optimal spare part supply - Asset Optimization Services provide a structured and systematic procedure for the holistic optimization of the supply of spare parts. The four phases of Asset Optimization Services are coordinated with each other but can also be used independently: - Phase I: Analysis
Determine the current spare part situation on site: Availability, product lifecycle, spare part delivery times - Phase II: Concept
The concept phase consists of an analysis of the actual requirements and the development of a spare part concept. - Phase III: Implementation
Based on the results of the concept phase, necessary inventory structures and inventory locations are established and spare parts procured. - Phase IV: Operation
The optimized and continuous supply of spare parts is an essential contribution to high plant availability. Depending on the specific contractual agreements, cyclic inventory analysis and a regular exchange of information also take place.
|
|