Network topology and network configuration SCALANCE X-200IRT Industrial Ethernet switches are usually installed in the control cabinet together with the stations to be connected (e.g. ET 200SP). When configuring the network, the following boundary conditions must be observed:
Commissioning and diagnostics PROFINET diagnostic alarms from SCALANCE X-200IRT Switches can be displayed with the appropriate SIMATIC Engineering Tools and processed in the control unit. The engineering outlay for the PLC and HMI have been drastically reduced due to the complete integration in the SIMATIC concept for system error messages. The SCALANCE X-200IRT Industrial Ethernet switches can also be integrated into a network management system through the standardized protocol SNMP (Simple Network Management Protocol). In the event of a device fault, error messages (SNMP traps) can be sent to a network system or as e-mail to a specified network manager. The integral web server enables configuration and diagnosis settings to be made using a standard browser. Statistical information can also be read out over the web server. Warning thresholds, and alarms generated by them, permit early recognition of critical fiber states (only with POF). Cable failures (fiber breakage) can thus be avoided, and plant downtimes reduced, since maintenance work can be carried out at an early point in time and outside production periods. The following information is displayed on site by LEDs:
The Industrial Ethernet switches of the SCALANCE X-200IRT line can also be monitored using the floating signaling contact. Configuration example for SCALANCE X204IRT Configuration with high-speed redundancy in the optical ring Redundant coupling of two subnetworks with SCALANCE X-200IRT |
| Каталог 2018 | Каталог 2017 | Каталог 2016 | Каталог 2015 | Каталог 2014 | Каталог 2013 | Каталог 2012 | Сертификат | Контакты | Карта сайта | Поиск |


