High plant availability by means of end-to-end redundancy
Connection to DNP3 master systems from third-party vendors is possible by using the open protocol DNP3
Saving of traveling and maintenance costs due to cost-effective remote programming, diagnostics, control and monitoring via the Internet
Reduction in time and costs thanks to quick and user-friendly configuration of connections and data to be transferred with the SINAUT configuration software and block library
Reliable back-up of important data; Storage of the DNP3 data points (max. 200,000 in the case of a master), including time stamp on the TIM if the communication path is faulty or a partner has failed