SIMOTION D425‑2 DP (on left) and SIMOTION D435‑2 DP/PN with CBE30‑2 inserted (on right) InterfacesDisplay and diagnostics
Onboard I/Os
Communication
Data backup
Additional interfaces
Option BoardsWith the TB30 Terminal Board, the SIMOTION D4x5-2 Control Units can be extended with 4 digital inputs, 4 digital outputs, 2 analog inputs and 2 analog outputs. The TB30 Terminal Board is plugged into the option slot on the Control Unit. Using the CBE30-2 Communication Board for PROFINET IO, it is possible to equip the SIMOTION D4x5-2 DP/PN Control Units with a second PROFINET interface with 4 ports.. Applications for a second PROFINET interface:
Note: The CBE30-2 cannot be used in SIMOTION D4x5 2 DP Control Units. If the CBE30-2 is used without SERVOFast and IPOFast, then both PROFINET interfaces are assigned to SERVO/IPO/IPO2. MountingThe SIMOTION D4x5‑2 Control Units can be mounted in the control cabinet in one of three ways:
With external air cooling, the cooling fins of the D445-2/D455-2 Control Unit are outside of the control cabinet. A seal (option) is available so that the Control Unit can be hermetically mounted in the rear cabinet panel. The SIMOTION D4x5-2 Control Units come with pre-installed spacers. These can be removed if necessary. Data storage/data backupThe SIMOTION D4x5-2 Control Units store the retentive process data permanently in a manner that requires no maintenance (refer to technical specifications for memory size). The real-time clock is backed up for several days via a SuperCap. The backup time can be extended via a battery in the double fan/battery module. The double fan/battery module incl. battery is contained in the scope of supply of the SIMOTION D4x5-2. The runtime software, user data and user programs are stored retentively on the CompactFlash Card (CF). The retentive process data of the Control Unit can also be stored on this CompactFlash card via system command, e.g. if spare parts are required. Extended execution system (SERVOFast / IPOFast)The SIMOTION D435‑2 DP/PN, D445‑2 DP/PN and D455‑2 DP/PN Control Units have (in addition to SERVO, IPO and IPO2) an additional second runtime level (SERVOFast and IPOFast). The additional runtime level allows the distribution of electric and/or hydraulic axes with different dynamic responses on a slow and a fast bus system so that the performance of the controller can be used more efficiently. It also enables a particularly fast I/O processing in conjunction with high-speed PROFINET I/O modules. Thanks to the extended execution system, electrical positioning drives, for example, can be controlled with cycle times in the millisecond range requiring fewer resources and, at the same time, the pressure-controlled axes of a hydraulic press can be controlled highly dynamically with short cycle times. Closed-loop control of an hydraulic press with SERVOFast and IPOFast If SERVOFast and IPOFast are activated, the following assignment applies:
If a second PROFINET interface is provided by means of a CBE30‑2, this will also be assigned to SERVO, IPO and IPO2. In this case, the onboard PROFINET interface is always assigned to SERVOFast und IPOFast. Connectable I/OsPROFINET IO:
PROFIBUS DP:
DRIVE‑CLiQ: Modules from the SINAMICS S120 range:
USB: The integrated USB interface allows, for example, a USB memory stick to be connected for a project or firmware update. Expansion with SINAMICS S120 drive modulesSINAMICS S120 drive modules in booksize format (Line Modules, Motor Modules, etc.) are connected to the SIMOTION D4x5-2 Control Unit over DRIVE-CLiQ. SINAMICS S120 PM240-2 Power Modules in blocksize format can be operated on the SIMOTION D4x5-2 Control Units with the CUA31/CUA32 Control Unit Adapters. Note: DRIVE-CLiQ cables which are required to connect Line Modules and Motor Modules to SIMOTION D are supplied in a standard length with the relevant Line Module/Motor Module.. |