- 1 SUB-D connector with mounting material for connecting the CU230P?2 HVAC/DP/PN/CAN Control Units to the operator panel (e.g. IOP)
- 1 motor connector and 1 power supply connector
- 2 serrated strips including mounting material for connecting the shield
- 3 sleeves for inserting in the cutouts for the signal cables of the cable bonding plate
- Ferrite cores
(only necessary for devices with integrated line filter class B) - 2-page Quick Start Guide with mounting instructions
| - 1 adapter cable for connecting the CU230P?2 HVAC/DP/PN/CAN Control Units to the operator panel (e.g. IOP)
- 4 clips to connect the shields of signal cables
- 6 serrated strips including mounting material for the motor and supply cables
- 4 sleeves (pre-installed in the cutouts for the signal cables of the cable bonding plate)
- 1 cable bonding plate without cutouts for customers to configure their own connection system
- 1 cabinet key
- 2-page Quick Start Guide with mounting instructions
|