Deprecated: Function eregi() is deprecated in /home/h101150-2/siemens71.ru/docs/new/cat.php on line 184
Increasing cost pressures, strong competition, stricter statutory directives, and high energy prices are great challenges for energy-intensive industries such as chemicals and pharmaceuticals. Plants can only remain economical in the future if the owners continuously modify them in accordance with the current demands.
With its Premium Service "Energy study", Siemens offers you holistic solutions with associated process optimization options for reducing operating costs. The Premium Service "Energy study" has a modular structure. The range of services covers evaluation of the plant's energy requirements, the preparation of a feasibility study for effective energy-saving measures, up to specific implementation of the determined measures in the plant.