Configuration required for SITRANS MDS is adopted from SIMATIC PDM. Only the project name must be entered.
Very few other entries are required, such as the definition of update periods.
Configuration required for SITRANS MDS is adopted from SIMATIC PDM. Only the project name must be entered.
Very few other entries are required, such as the definition of update periods.
© ООО "СК ЭНЕРГО" 2007-2022 (4872) 700-366 |