Siemens
СРЕДСТВА ПРОМЫШЛЕННОЙ АВТОМАТИЗАЦИИ
официальный партнер Сименс
Каталог СА01 2017
архивный
(4872) 700-366
skenergo@mail.ru

3SE7 Metal Enclosures
Makeup of the cable controls

Short lengths of rope up to 25 m

Long lengths of rope up to 50 m

Double operation up to 2 X 75 m

Note:

Appropriate differential springs are to be considered for larger temperature fluctuations. The PVC sheathing in the area of the terminal for the steel wire is to be removed to ensure secure fuse connection Cable supports at the recommended intervals need to be used.


















  © ООО "СК ЭНЕРГО" 2007-2022
  (4872) 700-366  skenergo@mail.ru
Яндекс.Метрика